Nikihil Gehlot (born on July 29, 1993) of Jodhpur, Rajasthan created a model of a bridge measuring 75 ft in length using 28,000 straws on connecting mumbai bandra worli sea link and jaiozhou Bay bridge, China. With 95 pillars for support made up It was created by using the straws each straws measuring 25 cm, the duration taken 16days, by
working 9 to 10 hours rugularly, He started from May 21, 2012 to June 5th, 2012. The name of the bridge is “THE NIKSTRAM BRIDGE MODEL”